Our Products
Testing Facilities :
 Facilities to carry out all routine tests, temperature rise tests, special tests We have viz Zero Phase sequence, capacitance & tan delta, harmonic analysis etc. Short Circuit Test can be carried out at CPRI/ERDA.








One Way Of Working Process
In order to maintain product quality and production efficiency, we follow a strict 6-step process to bring you your desired transformer, keeping you informed at every stage of the development

We ask for the required transformer’s technical specifications for us to scope the exact need.
Based on the design specifications we share an official quote with project timelines and other details.
Purchase order against the shared quotation is received as a confirmation of the project.
Production process begins in this order CORE, COIL Winding, Tanking, Assembly.
Transformer is put through multiple tests like High Voltage, DVDF, Leakage, Oil BDV, Load-Losses to measure conformity to IS Standards.
Once the transformer is cleared of all tests, it is wrapped and loaded safely on to the dispatch vehicle for delivery.